Main Facilities designed by Closed JSC RIVS-Project
№ | Name of facility | Brief description of facility | Types and scopes of works performed using own resources | year |
---|---|---|---|---|
1 | Uzelginskoye Field, Uchaly dressing mill, Russia, Bashkortostan | Dressing mill processing of copper zinc ore | General designing. Reconstruction of 1-2 sections of selective and bulk flotation cycle of copper-zinc ore of Uzelginskoye Field and screen separation unit of coarse-crushed ore | 2005 |
2 | Uchaly Mining and Dressing Complex Sibayskaya dressing mill, Russia, Bashkortostan, Sibay | Sibayskaya dressing mill processing Cu-Zn ore | Detail Design Documentation ‘Reconstruction Project of the 3rd stage of Sibayskaya dressing mill with Capacity 1.5 million tons of ore per annum’ Sub-contract. General construction solutions.Electric power supply system – WELD, LLC | 2006 |
3 | Zyryanovsky Mining and Dressing Complex, Kazakhstan,Zyryanovs. | Zyryanovsky Mining and Dressing Complex. Processing of Cu, Zn, Pb, Au ores | General designing. Reconstruction of dressing mill of Zyryanovsky Mining and Dressing Complex with objective to process 2.5 million tons of ore per annum and to increase process parameters including installation of flotation machines and aeration units RIF | 2006 |
4 | Riddersky Mining and Dressing Complex, Kazakhstan | Riddersky Mining and Dressing Complex. Processing of Cu, Zn, Pb, Au ores | General designing. Reconstruction of flotation section including fabrication of flotation machines and conditioning tank RIF | 2006 |
5 | Uzelginskoye Field, Uchaly dressing mill, Russia, Bashkortostan | Dressing mill processing of copper zinc ore | General designing. Unit of zinc concentrate conditioning. | 2006 |
6 | Zangezursky Copper-Molybdenum Combine, Armenia, Kajaran | Dressing mill processing copper-molybdenum ore and man-caused feedstock | General designing. ‘Extension of dressing mill of Closed JSC “Zangezursky MMC’ to achieve capacity up to 12.5 million tons of base ore. Feasibility study for the crushing section | 2007 |
7 | Zangezursky Copper-Molybdenum Combine, Armenia, Kajaran, Teghut | New construction. Plant processing copper-molybdenum ore and man-caused feedstock | General designing. ‘Design of pilot Industrial Plant Processing Copper-Molybdenum ore and Man-caused Feedstock of Closed JSC Zangezursky Copper-Molybdenum Combine | 2007 |
8 | Dressing mill Maykainzoloto, Kazakhstan, Maykain | Dressing mill processing copper zinc ore | General designing. Development of process flow sheet for reagent mode for flotation of copper zinc ore from field Maykain B. Development of process procedure and detail design documentation on classification and flotation cycles reconstruction of dressing mill at JSC Maykainzoloto for production of 500 thousand tons of ore per annum. | 2007 |
9 | Uchaly Mining and Dressing Complex, Sibayskaya dressing mill, Russia, Bashkortostan, Sibay | Sibayskaya dressing mill processing copper zinc ore | Field supervision over reconstruction of the 3rd stage of the Sibayskaya dressing mill. | 2007 |
10 | Khaibullinskaya dressing mill, Bashkirskaya Med, LLC, Russia, Bashkortostan, Khaibullinsky District | New construction of dressing mill processing copper zinc ore | Development of feasibility study for construction of Khaibullinskaya dressing mill processing ore from Yubileynoye field | 2007 |
11 | Khaibullinskaya dressing mill, Bashkirskaya Med, LLC, Russia, Bashkortostan, Khaibullinsky District | New construction of dressing mill processing copper zinc ore | General designing. Development of design documentation for the facility of Khaibullinskaya dressing mill. Declaration of industrial safety of the tailing dump under design. Safety expert survey of the designed tailing dump at Khaibullinskaya dressing mill. | 2007 |
12 | Almalyksky Mining and Dressing Complex, Khandiza field, Uzbekistan, Almalyk | New construction. Processing copper lead zinc ore | Elaboration of preliminary feasibility study for involvement poly-metallic ore of Khandiza field into processing | 2007 |
13 | Karelsky Okatysh, JSC, Russia, Republic of Karelia, Kostomuksha | Dressing mill processing magnetite ore | General designing. Development of detailed project: ‘Section of Flotation Conditioning of Magnetite Concentrate of JSC Karelsky Okatysh with capacity 4 million tons per annum for conditioned concentrate’ | 2007 |
14 | Erdenet dressing mill, Mongolia, Erdenet, Erdenet, MR Ltd | Dressing mill processing copper-molybdenum ore | General designing. Development of design estimates for replacement of flotation machines FPR-40 No 72 and No 73 at Section No 5 of the dressing mill for RIF-45 | 2007 |
15 | Erdenet dressing mill, Mongolia, Erdenet, Erdenet, MR Ltd | Dressing mill processing copper-molybdenum ore | General designing. Development of detailed desing for increase in the front of recleaning unit of the first twinned section | 2007 |
16 | Erdenet dressing mill, Mongolia, Erdenet, Erdenet, MR Ltd | Dressing mill processing copper-molybdenum ore | General designing. Design estimates for the 2nd flotation section of the dressing mill | 2007 |
17 | Mongol-Russian Joint Venture Mongolrostsvetmet, Mining Processing Combine Bor-Undur, Mongolia, Bor-Undur | Dressing mill processing fluorite ore | General designing. Feasibility study + detailed designing. Modernization of dressing mill of Bor-Undur Mining and dressing complex. Development of the project on a turn-key basis. | 2007 |
18 | Apatite Nepheline Dressing mill -2, Russia, Murmansk Region, Apatity | Detailed design modernization. Mining and dressing complex processing apatite nepheline ore | Elaboration of engineering documentation for installation of magnetic separator in the unit for nepheline concentrate processing (KPNk)of Apatite nepheline dressing mill -2 for removal of aegirine from nepheline concentrate | 2007 |
19 | Apatite Nepheline Dressing mill -2, Russia, Murmansk Region, Apatity | Modernization of dressing mill processing apatite-nepheline ore | Change of storage streams of different grade products of nepheline production at Apatite nepheline dressing mill -2 to silos | 2007 |
20 | Kalmakyr Field, Uzbekistan, Alamalyk | New construction. Processing of copper-molybdenum ore | Preliminary feasibility study of the project: ‘Involvement of out-of-balance waste ores of Kalmakyr Field into Processing | 2008 |
21 | Copper dressing mill, Uzbekistan, Almalyk | Copper dressing mill | Preliminary feasibility study of project: ‘Reconstruction of 10-12 sections of the main building of Copper dressing mill | 2008 |
22 | Korshunovsky Mining and dressing complex, Russia | Processing of iron ore | Feasibility study for processing of off-grade (out-of-balance) iron ore of Rudnogorsky Field at Korshunovsky Mining and dressing complex using dry magnetic separation | 2008 |
23 | Khudesskaya dressing mill, Russia, Yekaterinburg | New construction of the dressing mill processing copper zinc ore | General designing. Feasibility study of investments into construction of Khudesskaya dressing mill with capacity 1.5 million tons per annum for base ore | 2008 |
24 | JSC Kolskaya Mining Metallurgic Company, Russia, Zapolyarny | Dressing mill processing copper nickel ore | Defining of the optimum variant of construction, operation of the unit for coarse-crushed ore preparation and follow-up processing of screened stock at dressing mill of JSC Kolskaya Mining metallurgic company | 2008 |
25 | JSC Kolskaya Mining Metallurgic Company, Russia, Zapolyarny | Dressing mill processing copper nickel ore | Elaboration of recovery and operation flow sheet of supplementary semi-section of 1st floatation section at Kolskaya Mining Metallurgic company JSC dressing mill | 2008 |
26 | Erdenet dressing mill, Mongolia, Erdenet, Erdenet, MR Ltd | Dressing mill processing copper-molybdenum ore | General designing. Performance of works on industrial implementation of new flotation technology at the 3rd stage of flotation of Erdenet dressing mill including replacement of outdated flotation equipment and achieving of capacity up to 6 million tons per annum for base ore | 2008 |
27 | Navoiisky Mining Metallurgic Combine, Uzbekistan, Zarmitan Settelement | New construction. Complex for processing of gold ore | General designing. Elaboration of process procedure and detail design documentation for the processing complex of the gold recovery unit with capacity of 1.8 million tons per annum | 2009 |
28 | Navoiisky Mining Metallurgic Combine, Uzbekistan, Zarmitan Settelement | New construction. Dressing mill processing gold ore | Detail design documentation of the 2nd stage of flotation, thickening, dosage of reagents at Mining and Metallurgic complex -3 with capacity 3,200 tons per annum for combined raw materials base of Kokpatas and Daugyzsta gold fields | 2009 |
29 | Khaibullinskaya dressing mill, Bashkirskaya Med, LLC, Russia, Bashkortostan, Khaibullinsky District | New construction of dressing mill processing copper zinc ore | Elaboration of detail design documentation for construction of Khaibullinskaya dressing mill with capacity of 3 million tons of ore per annum for ore processing from Yubileynoye Field | 2009 |
30 | Kazakhmys PLC, Kazakhstan, Jezkazgan | New construction. Processing of Cu, Zn, Pb ore | Preliminary feasibility study of the main engineering solutions for construction of new dressing mill at Jezkazgantsvetmet with comparison of options of location on the ground and in underground mining with capacity 4 million tons per annum | 2009 |
31 | Satpaevskaya dressing mill, Kazakhstan, Jezkazgan | Extension of dressing mill with increase of production. Processing Cu, Zn, Pb ore. | Process procedure for design and technical economic estimate ‘Increase of Capacity of Satpaevskaya Dressing Mill up to 10 million tons per annum | 2009 |
32 | Khaibullinskaya dressing mill, Bashkirskaya Med, LLC, Russia, Bashkortostan, Khaibullinsky District | New construction of the dressing mill processing copper zinc ore | Field supervision over construction of Khaybullinskaya dressing mill | 2010 |
33 | Erdenet dressing mill, Mongolia, Erdenet, Erdenet, MR Ltd | Dressing mill processing copper-molybdenum ore | General designing. Project of reconstruction of industrial product flotation cycle of the 6th section at Erdenet dressing mill | 2010 |
34 | Erdenet dressing mill, Mongolia, Erdenet, Erdenet, MR Ltd | Reconstruction of Erdenet dressing mill, processing of Cu, Mo ore | Design estimates for reconstruction of the 4th stage of flotation of the dressing mill with capacity 4 million tons per annum and selection unit | 2010 |
35 | Erdenet dressing mill, Mongolia, Erdenet, Erdenet, MR Ltd | Reconstruction of Erdenet Dressing mill processing Cu, Mo ore | Design estimates for extension of the autogenous grinding unit with increase of capacity by 12 million tons per annum (up to 18 million tons per annum) | 2010 |
36 | Uchaly Mining and dressing complex, Uchaly dressing mill, Russia, Bashkortostan, Uchaly | Mining and dressing complex as a part of the branch of Uchaly dressing mill processing copper zinc ore | General designing. ‘Elaboration of Design and Detail Design Documentation for Reconstruction of Uchaly Dressing Mill to Increase Capacity up to 6.5 million tons of ore per annum | 2010 |
37 | Novoangarsky Dressing Complex, LLC Dressing mill, Russia, Krasnoyarsk Territory, Motyginsky District, Novoangarsk Settlement | Dressing mill processing lead-zinc ore | General designing. ‘Development of detailed design. Flotation Section Using Flotation Machines RIF’ | 2010 |
38 | Novoangarsky Dressing Complex, LLC Dressing mill, Russia, Krasnoyarsk Territory, Motyginsky District, Novoangarsk Settlement | Extension of the operating enterprise. Dressing mill processing lead-zinc ore. | General designing. ‘Extension of Dressing Mill of Novoangarsky Dressing Complex to Achieve Capacity of Ore Processing from 1.0 to 2.5 million tons per annum | 2010 |
39 | Belousovskaya dressing mill, Kazakhstan, Ust-Kamenogors, MCC Eastern Region | Reconstruction, Dressing mill processing zinc ore | Detail design documentation for section of zinc flotation at Belousovskaya Dressing Mill (sections Process Technology, Process Automation, Electric Supply, Electrical power equipment) | 2010 |
40 | Zangezursky Copper-Molybdenum Combine, Armenia, Kajaran | Dressing mill extennsion with increase of capacity. Dressing mill processing copper molybdenum ore | General designing. ‘Project for Installation Thickener of Bulk Cycle at Closed JSC Zangezursky Copper – Molybdenum Combine | 2010 |
41 | JSC Inguletsky Mining Processing Combine, Ukraine, Dnepropetrovsk Region, Krivoy Rog | Dressing mill processing hematite ore | General designing. Technical and economic estimate for elaboration of feasibility study for construction of crushing and dressing complex for dressing of hematite ore of JSC Inguletsky Mining Processing Combine with capacity 7.0 million tons of ore per annum | 2011 |
42 | JSC Gaysky Mining Processing Combine, Russia, Orenburg Region, Gay | Re-equipment. Dressing mill processing copper zinc ore | General designing. JSC Gaysky Mining processing combine. Dressing mill. Flotation Section. Design stage. Detail design documentation | 2012 |
43 | Almalyksky Mining and Metallurgical Company, Khandiza field, Uzbekistan, Almalyk | Reconstruction of ore processing at copper dressing mill | General designing. Reconstruction of sections of crushing and grinding at the copper dressing mill | 2012 |
44 | Zangezursky Copper-Molybdenum Combine, Armenia, Kajaran | Extension of dressing mill with increase in capacity. Dressing mill processing copper molybdenum ore | General designing. Extension of the dressing mill of Zangezursky Copper-Molybdenum Combine to achieve capacity of ore processing up to 12.5 million tons per annum. Construction of semi-autogenous grinding unit | 2012 |
45 | Nikolayevskaya dressing mill, Kazakhmys PLC, Copper Chemical Combine, Republic of Kazakhstan, Eastern Kazakhstan Region, Ust-Talovka | Reconstruction. Dressing mill processing copper zinc ore and copper lead zinc ore | General designing. Detailed project of reconstruction of reagent dosage and unit of reagent preparation at Nikolayevskaya dressing mill | 2012 |
46 | Nikolayevskaya dressing mill, Kazakhmys PLC, Copper Chemical Combine, Republic of Kazakhstan, Eastern Kazakhstan Region, Ust-Talovka | Reconstruction. Dressing mill processing copper zinc ore and copper lead zinc ore | General designing. Detailed project of reconstruction of flotation section at Nikolayevskaya dressing mill | 2012 |
47 | Nikolayevskaya dressing mill, Kazakhmys PLC, Copper Chemical Combine, Republic of Kazakhstan, Eastern Kazakhstan Region, Ust-Talovka | Reconstruction. Dressing mill processing copper zinc ore and copper lead zinc ore | General designing. Feasibility study of the main engineering solutions for increase in production of Nikolayevskaya dressing mill up to 2.2 million tons per annum with receipt of four concentrates: Cu, Pb, Zn, precious metalls | 2012 |
48 | Nikolayevskaya dressing mill, Kazakhmys PLC, Copper Chemical Combine, Republic of Kazakhstan, Eastern Kazakhstan Region, Ust-Talovka | Reconstruction. Dressing mill processing copper zinc ore and copper lead zinc ore | General designing. Detailed project of reconstruction of grinding section at Nikolayevskaya dressing mill | 2012 |
49 | Khaibullinskaya dressing mill, Bashkirskaya Med, LLC, Russia, Bashkortostan, Khaibullinsky District | New construction of the dressing mill processing copper zinc ore | General designing. Storehouse of copper concentrate. Storehouse of zinc concentrate with the loading unit | 2011 |
50 | Dressing mill of Malyshevsky Mining Administration, Ore Mining Company Uralskoye Zoloto, LLC Asbest, Malyshevka Settlement | Consolidated technical economic estimate for dressing mill of Malyshevsky Mining Administration processing molybdenum ore | General designing. Design documentation and detailed design documentation ‘Reconstruction of dressing mill of Malyshevsky Mining Administration in order to process Molybdenum Ore of South-Shameiskoye Field | 2011 |
51 | Zangezursky Copper-Molybdenum Combine, Armenia, Kajaran | Reconstruction. Detailed design documentation. Zangezursky Copper-Molybdenum Combine. Dressing mill processing copper molybdenum ore | Extension of dressing mill of Zangezursky Copper-Molybdenum Combine to achieve capacity up to 20 million tons per annum for Base Ore | 2011 |
52 | Erdenet dressing mill, Mongolia, Erdenet, Erdenet, MR Ltd | Dressing mill processing copper molybdenum ore | General designing. ‘Reconstruction of the 6th flotation section of Erdenet dressing mill | 2012 |
53 | Erdenet dressing mill, Mongolia, Erdenet, Erdenet, MR Ltd | Dressing mill processing copper molybdenum ore | General designing. ‘Reconstruction of Flotation Machine tech No 84, 85 at Erdenet dressing mill with Installation of Attrition Complex | 2012 |
54 | Valentor Copper Mine, LLC, JSC Ural-Polymetall, Sverdlovsk Region, Karpinsk | Re-equipment of Valentor Copper Mine, LLC Dressing mill processing copper magnesium, copper zinc and copper ores | General designing. Detailed design documentation. ‘Replacement of Flotation Machines FM 3,2 for Flotation Machines RIF 8,5 | 2012 |
55 | Khaibullinskaya dressing mill, Bashkirskaya Med, LLC, Russia, Bashkortostan, Khaibullinsky District | Re-equipment. Khaibullinskaya Dressing mill processing copper and copper zinc ores | General designing. ‘Air Compressor Plant. Re-equipment with System of Oil Condensation and Collection | 2012 |
56 | Erdenet dressing mill, Mongolia, Erdenet, Erdenet, MR Ltd | Dressing mill processing copper molibdenum ore | General designing. Erdenet enterprise. “Lime milk preparation section”. Sections “Process technology”, “Construction solutions”, Reinforced concrete structures”, “Metal structures”, “Electrical lighting” | 2013 |
57 | Carmen Copper Corporation, Philippines | Dressing mill processing molybdenum ore | General designing. Philippines. «Carmen» «Carmen Copper Corporation. Construction of molybdenum concentrate production section | 2013 |
58 | Almalyksky Mining and Metallurgical complex, Khandiza field, Uzbekistan, Almalyk | Reconstruction. Processing of copper, lead, zinc ores | General designing. Development of detailed documentation, field supervision over construction of facility “Reconstruction of crushing and grinding sections at copper dressing mill» | 2013 |
59 | Kazakhmys Corporation PLC, ZhTsM | Concentrator reconstruction. | Preliminary feasibility study of Zhezkazgantsvetmet concentrator reconstruction. | 2013 |
60 | Kazakhmys Corporation PLC, ZhTsM | Processing of oxidized and mixed ores. | Preliminary feasibility study of oxidized and mixed ore processing for Kresto-Zlatoust sites of the Zhezkazgan deposit and the Taskora deposit. | 2013 |
61 | Erdenet, Mongolian-Russian venture Erdenet Mining Corporation LLC, Mongolia | Copper-molybdenum ore processing concentrator. | Feasibility study “Technical Reequipment of Primary Ore Preparation. The 4th Crushing Stage.” | 2013 |
62 | “GeoProMining Gold” LLC | PA “Armzoloto,” Ararat gold extraction plant. Reconstruction of the Ararat gold extraction plant. | Detailed documentation for reconstruction of the Ararat gold extraction plant in terms of sections EM (power electric equipment) and EO (electric lighting), designing of automation facilities for the flotation site of the Ararat dressing plant. | 2014 |
63 | “Svyatogor” OJSC | Copper and copper-zinc ore processing concentrator. The second stage of SMTsR (Northern Copper-Zinc Mine) expansion. | Construction of the Severnaya concentrator for processing of copper and copper-zinc ores from Novo-Shemurskoye deposit with linear facilities. | 2014 |
64 | “AMK” LLP | Reconstruction of “AMK” LLP's OF-1 and OF-2 concentrators. | Detailed documentation for reconstruction of “AMK” LLP's OF-1 and OF-2 concentrators. | 2014 |
65 | “Mining Company Uralskoye Zoloto” LLC | Concentrator reconstruction for processing of molybdenum ores from the Yuzhno-Shameyskoye deposit. | Development of design estimate documentation for the facility: “Reconstruction of the Malyshevskoye Mine Administration concentrator for processing of molybdenum ores from the Yuzhno-Shameyskoye deposit.” | 2014 |
66 | “Siberia Polymetals” OJSC | Reconstruction of a polymetallic ore deposit concentrator for ores with high contents of copper, zinc, lead, and precious metals. | Rubtsovsk concentrator reconstruction in order to increase the ore capacity up to 1.5 million tons a year. | 2014 |
67 | Nurkazgan concentrator, Kazakhmys Corporation PLC, Temirtau, Kazakhstan | Processing of copper-zinc and copper-lead ores. | Development of process regulations and a two-stage Nurkazgan concentrator reconstruction project for copper-ore dressing in the amount of 4.0 million tons of ore a year. | 2014 |
68 | Kazakhmys Corporation PLC | Construction of a pilot hydrometallurgical processing site for rough copper concentrates with oxidizing-chloridizing roasting in an inclined-grate-cascade-type shaft furnace with a pelletized-batch capacity of 5 tons/hour. | Design works for amendments to process regulations and development of the two-stage project “Construction of a pilot hydrometallurgical processing site for rough copper concentrates with oxidizing-chloridizing roasting in an inclined-grate-cascade-type shaft furnace with a pelletized-batch capacity of 5 tons/hour.” | 2014 |
69 | Kazakhmys Corporation PLC | Reconstruction of ready-concentrate (Cu, Pb, Zn) thickening, filtration, and shipping departments of the Nikolayevsky concentrator. | Detailed documentation for reconstruction of ready-concentrate (Cu, Pb, Zn) thickening, filtration, and shipping departments of the Nikolayevsky concentrator. | 2014 |
70 | Zangezur Copper and Molybdenum Combine, Teghut, Kajaran, Armenia | Copper-molybdenum ore processing concentrator. | General design. Services on development of process sketches for detailed documentation (Process Design): “Reconstruction of a Receiving Hopper at the Coarse Crushing Department with Discharge of 300mm Mined Ore from the Coarse Crushing Stage.” | 2014 |
71 | Kazakhmys Corporation PLC | Reconstruction. Processing of copper-zinc and copper-lead ores. | General design. Development of process regulations and a two-stage Nurkazgan concentrator reconstruction project for copper-ore dressing in the amount of 4.0 million tons of ore a year. | 2014 |
72 | “Aleksandrinskaya Gornorudnaya Kompaniya” OJSC | Primary processing of copper ore from one of Russian largest copper-zinc deposits – Aleksandrinskoye. | Upgrading of the flotation department. Upgrading of the flotation department at the concentrator of “Aleksandrinskaya Gornorudnaya Kompaniya” OJSC. Detailed documentation: installation of additional equipment. Part TKh (manufacturing technology). | 2014 |
73 | “Aleksandrinskaya Gornorudnaya Kompaniya” OJSC | Primary processing of copper ore from one of Russian largest copper-zinc deposits – Aleksandrinskoye. Upgrading of the flotation department. | Upgrading of the flotation department at the concentrator of “Aleksandrinskaya Gornorudnaya Kompaniya” OJSC. Detailed documentation: installation of additional equipment. Parts KZh (reinforced concrete structures), KM (metal structures), and ES (power supply). | 2014 |
74 | Kazakhmys Corporation PLC | Construction of a pilot hydrometallurgical processing site for rough copper concentrates | Amendments to the process regulations and development of the two-stage project “Construction of a Pilot Hydrometallurgical Processing Site for Rough Copper Concentrates with Oxidizing-Chloridizing Roasting in an Inclined-Grate-Cascade-Type Shaft Furnace with a Pelletized-Batch Capacity of 5 Tons/Hour.” | 2015 |
75 | Kazakhmys Corporation PLC | Construction of a pilot hydrometallurgical processing site for rough copper concentrates. | Development of the two-stage project “Construction of a Pilot Hydrometallurgical Processing Site for Rough Copper Concentrates by the Direct Leaching Method.” | 2015 |
76 | “Laki Invest” JSC (Laki, Bulgaria) | Polymetallic ores from the Dzhurkovo and Druzhba deposits. Development of a technical and economic assessment. | “Development of the Preliminary Feasibility Study of Upgrading Investments for the Laki Concentrator of 'Laki Invest' JSC.” | 2015 |
77 | “Machine Building Plant RIVS” LLC. | Technical reequipment. | Design of “Machine Building Plant RIVS” LLC. Technical reequipment. Research Centre. | 2015 |
78 | “Sagamar” CJSC, Armenia | The ore mining and processing plant near the Armanis polymetallic deposit, Lori Province, Armenia. | Technical reequipment of the “Sagamar” CJSC processing plant through increase of the mined-ore capacity up to 500 thousand tons a year. Detailed documentation.” | 2015 |
79 | “Gaysky GOK” OJSC | Gayskaya concentrator. The Gayskoye copper-sulphide deposit is located in the east of the Orenburg Region, on the area of the Gaysky District. | “Gaysky GOK” OJSC Concentrator. Technical reequipment of individual processes in order to achieve the ore processing up to 10 million tons a year. | 2015 |
80 | VertexGoldCompany LLC, Talas Province, Kyrgyzstan | Shiraldzhin gold-ore deposit, Talas Province, Kyrgyzstan. | Construction of a gold extracting and concentrating plant with a capacity of 500 thousand tons a year with tailing facilities and recycling water supply. | 2015 |
81 | Kazakhmys Corporation PLC. Karagaily concentrator | Copper ore processing concentrator. | Upgrading of the Karagaily concentrator. | 2015 |
82 | Kazakhmys Corporation PLC, ZhTsM. Nurkazgan concentrator. Kazakhstan | Processing of copper-zinc and copper-lead ores. | “Development of the Technical and Economic Assessment for Implementation Efficiency of Nurkazgan Concentrator Reconstruction with Stage-by-Stage Increase of the Capacity up to 4.0 Million Tons a Year and 7.3 Million Tons a Year.” | 2016 |
83 | Kazakhmys Corporation PLC. Nikolayevsky concentrator. Kazakhstan | Copper, copper-zinc, and polymetallic ore processing concentrator. | The STsA was developed. A modifier drawing is under development. An assignment for installation of a batching table and a header tank was issued to the construction department. | 2016 |
84 | Erdenet Mining Corporation LLC. Mongolia Erdenet | Copper-molybdenum ore processing concentrator. | Feasibility study “A Development Concept of Erdenet Mining Corporation LLC for 2016-2025 with Increase of the Concentrator's Ore Processing up to 40 Million Tons a Year” for the facility Erdenet Mining Corporation LLC (Mongolia). | 2016 |