News

Quotations

Foreign exchange rates for 10/05/2024
RUB/USD:91,8239
RUB/EUR:98,9461
London Metal Exchange data for 10/05/2024
Copper 6,110.00
Nickel 13,045.00
Tin 17,100.00
Lead 1,816.00
Zinc 2,078.50
 »Main
20.03.2018

The positive conclusion of the State Expertise on the project "Construction and equipping of the Shiralgin processing plant for the Global Shiralgin Mining LLC (Kyrgyz Republic)

A positive conclusion was received from the Department of State Expertise of the Kyrgyz Republic on the project "Construction of the Shiraljin Processing Plant with a capacity of 500 thousand tons of ore per year with infrastructure and tailing facilities."
The RIVS has completed a comprehensive field development project (greenfield project), including:
• facilities of the processing plant (ore preparation, grinding, flotation, thickening, filtration, shipment of concentrate);
• tailing dump (dry laying of filtered tailings);
• field infrastructure facilities (shift camp for 300 places, auxiliary facilities of a mining enterprise, treatment facilities and reverse water supply facilities);
• technical water supply facilities.
The Shiraldzhin gold ore deposit is located in the north-west of the Kyrgyz Republic, on the northern slope of the Talas Range. Altitudes 2700 - 2900 meters above sea level, site seismicity - 9 points.
The prepared documentation fully meets the modern requirements of the design of mining enterprises  

Search on site

© 2008 "РИВС"