10.06.2019
Technical re-equipment of Rubtsovskaya ore-dressing plant
The RIVS group of companies is carrying out technical re-equipment of the main building of the Rubtsovsk ore-dressing plant.Work is carried out without stopping the process.
At the moment, 2 stages have been completed to replace the FM-6.3 flotation cells with the RIF pneumomechanical flotation cells:
Stage 1 - installation and commissioning of a 13-chamber RIF-3,5 flotation machine. March 2019
Stage 2 - installation and commissioning of two flotation cells of the 5-chamber RIF-16 and 2-chamber RIF-16. June 2019
As a result of the work on the processing of polymetallic ores, the extraction of the useful product into the finished concentrate has been increased.